Skip to main content

Lidcombe NSW 2141

Keys and fobs for Lidcombe buildings and who authorised the contractor

A contractor holds a fob that opens most of the building. Somebody issued it, probably years ago, and there may be no record of who that was or what the fob currently opens. Nobody thinks about it until the arrangement ends.

In short

Access to common property in a Lidcombe building is controlled by the owners corporation or the building owner, and issuing a key or fob to a contractor is a decision that should be made and recorded by that party rather than arranged informally on site.

Clean Best records what access media it holds, which areas each opens and who authorised the issue, and returns everything at the end of an arrangement with confirmation. Access beyond the scoped areas is neither requested nor held. The register is kept by the scheme rather than only by the contractor.

The register nobody keeps until they need it

Ask most schemes who holds access to their building and the answer is a list of guesses. Contractors have come and gone, fobs have been issued by successive managers, and the system may never have been audited. That is uncomfortable in an ordinary building and considerably more so in one with tenancies holding sensitive material. The absence of a register is rarely deliberate and always inconvenient.

Keeping a simple register costs nothing. Who holds what, which areas it opens, who authorised it and when. It is the sort of document that seems unnecessary right up to the moment a committee has to answer a question about it, at which point its absence becomes the whole story. Building it into the cleaning arrangement gives the scheme at least one accurate entry. One accurate entry is a better starting point than none at all.

Scoped areas and nothing further

A contractor should hold access only to the areas it is engaged to service. In practice buildings often issue a master because it is simpler, which gives a cleaning crew the ability to enter plant rooms, storage areas and sometimes tenancies that have nothing to do with their scope. Nobody intends that; it is a convenience decision made without much thought. Convenience at the point of issue becomes a question nobody can answer years later.

The better arrangement is to issue only what the scope requires and to state in writing what that covers. It is easier to administer than it sounds and it removes a category of risk entirely. Clean Best does not seek access beyond the scoped areas and states in the proposal exactly what is required to deliver the work. Restricted access is also easier for a crew to work with than a master they must be careful about.

The end of an arrangement is where the risk sits

Access is issued carefully and returned casually. A contractor finishes, the last invoice is paid, and nobody follows up on the fob. Where the building has an electronic system, deactivation is straightforward if somebody remembers to do it. Where it has keys, the scheme has no way of knowing whether copies were ever made. Keys in particular leave a scheme with no way of closing the question properly.

Building the return into the arrangement rather than treating it as an afterthought closes it properly. Confirmation in writing that media were returned or deactivated, on a stated date, gives the scheme a clean record. Clean Best provides that confirmation as a matter of course, because an open question about building access is not something either party benefits from leaving unresolved. A dated confirmation is what allows a committee to close the item.

Access control points for a Lidcombe building

  • A register of who holds what and which areas it opens
  • The authorising party recorded for each issue
  • Access limited to the areas the scope actually requires
  • No master issued where a restricted set will do
  • Written confirmation of return or deactivation at the end
  • The register reviewed when a committee or agent changes
Clean Best supervisor reviewing office and strata cleaning quality in Parramatta NSW

Working in Lidcombe and the Central West

Lidcombe in the Central West carries industrial, retail, healthcare and mixed-use premises, with buildings that combine occupiers keeping quite different hours and holding quite different views about who should be able to enter the building outside them. Access arrangements in schemes of that kind accumulate over years as contractors change and managers move on, usually without any register being kept. Nobody examines the position until the arrangement ends or something goes missing. Clean Best services Lidcombe from Seven Hills and records the access it holds in the scope.

Questions about Lidcombe

Who authorises a contractor to hold building access?

The owners corporation or the building owner, usually through the committee, the building manager or the strata managing agent. It should be a recorded decision rather than an informal handover on site, because the scheme remains answerable for who can enter its common property. Recording it also means the position survives a change of manager.

Should a cleaning contractor hold a master key?

Only where the scope genuinely requires access to every area, which is unusual. Issuing a master is simpler to administer but gives access to plant rooms, storage and sometimes tenancies well outside the work. A restricted set matched to the scope removes a category of risk for very little additional effort. Most cleaning scopes need far less access than a master provides.

What happens to the fobs when the arrangement ends?

They are returned or deactivated and the scheme receives written confirmation with a date. Access is usually issued carefully and returned casually, which is where the risk sits. Building the return into the arrangement means it happens as part of the process rather than depending on somebody remembering weeks afterwards. It also gives the scheme a clean closing record for that contractor.

Do we need to know which areas each fob opens?

Yes, because a fob that opens more than the holder needs is a gap nobody has assessed. The register should record the areas rather than just the number of media issued. That is the information a committee actually needs when it reviews access, and it is almost never recorded at the time of issue. Media counts without area detail tell a committee almost nothing.

Our building has had many contractors over the years. Where do we start?

With the current ones, since that is the position you can actually establish. Ask each for confirmation of what they hold and record it, then review the electronic system if there is one. A partial accurate register is considerably more useful than an attempt to reconstruct a decade of informal issues. Accuracy from today forward is worth more than an incomplete history.

Get a fixed written quote for Lidcombe

Free walkthrough, scope in writing, price back within 24 hours.

Request a quote
Call nowEmail us